News March 28, 2017 A 33 MW. Coal Based Captive Power Plant of The Andhra Sugars A 33 MW. Coal Based Captive Power Plant of The Andhra Sugars Ltd., Power Division at Saggonda has been synchronized to the Grid on 24-03-2017 and commenced its operations Read More About AndhraSugarsAdmin